GESTION DE PROJETS
Refurbishment no tenants 2013-2015

location

Seita building

surface Area

No items found.
Projects

The "Seita" building was built in two construction phases between 1933 and 1942 as a six-storey office and administration building with two basements and is now a listed building.


Refurbishment of the entire building to regain "premium" building status.
- Increase of occupancy capacity by installing additional toilet rooms
- attic front house and underground car park with passenger elevators                                                          
- New rung of the elevator front rooms
- quality window courtyard wg fire rollover
- Double glazing of all windows
- Disabled access EC main entrance front house                    
- BREEAM certification at a very good level

contacT-us

The "Seita" building was built in two construction phases between 1933 and 1942 as a six-storey office and administration building with two basements and is now a listed building.


Refurbishment of the entire building to regain "premium" building status.
- Increase of occupancy capacity by installing additional toilet rooms
- attic front house and underground car park with passenger elevators                                                          
- New rung of the elevator front rooms
- quality window courtyard wg fire rollover
- Double glazing of all windows
- Disabled access EC main entrance front house                    
- BREEAM certification at a very good level

PRojects
contacT-us
Jagna Bourdeau Dipl.Ing.Architektin MRICS CHARTERED SURVEYOR
Impressum / Datenschutz